| Bitumen Modification Plants |
| Bitumen |
- Storage
- Preparation
- Modification
- Heating
- Dosing
- Blending
- Loading
- Transportation

|
| Mobile and stationary Polymer Modification Plants |
 |
| Containerized Polymer Modification Plant |
 |
| Cold Processing I |
Reclaimed asphalt planings can be added in quantities up to 25 % direct into the paddle mixer where it is homogenously mixed with virgin aggregates.

|
| Cold Processing II |
A further innovative system is to introduce the reclaimed asphalt planings into the discharge end of the dryer via a “high speed” slinger conveyor to mix with the virgin aggregates. Heat transfer starts to occur in the dryer and flue gases produced pass through the existing system. Heat transfer continues.
|
| Hot Recycling |
For larger quantities of reclaimed asphalt planing processing, up to 100%, hot recycling is necessary. This is achieved through a separate, uniflow large volume drying drum equipped with a special BENNINGHOVEN developed.
|
| "Mix-Gas" Recycling Burner |



|
| 160 t/h Hot Recycling Parallel drum system |
|
| 120 t/h Hot Recycling Parallel drum system |
|
| Plant Configuration / Design |
|
|
|